The Master Bath Upgrade
for Bob & Posy 


We are currently under construction to update the bathroom for our Master Bedroom. The following include some of the pictures of the current status and plans for the update.

Originally the bathroom had a toilet in the middle of the room, sink to the left and bathtub/shower to the right. I don't have any pics of the old setup, but when we finished the dressing room we removed the wall between the dressing room and bathroom so that we could remove the tub. We then re-installed the wall. The new plan was to include a toilet room to the left and a large shower to the right with an entryway in the center. There is no need for the sink as we have added two sinks to the dressing room.

Pace has the shower and toilet room finished with a beautiful pocket door installed for the pottie room. Wiring, lights and fans are installed, along with all the plumbing and fixtures. The systems are operational and almost complete except for the final layers of drywall and paint.

The following show some of the under construction pictures that I have collected.

   

Bob & Posy Snyder

Return to our Home Page.

1215 Limestone Avenue
Loveland, Colorado 80537

© 2000-2008 Snyder Smart Systems

URL: http://www.snyderville.net/masterbath.html
First created: May 27, 2000
Last updated: March 15, 2008